Thursday, April 2, 2009
Topping Off the Load
240 tons of gold ore being topped off with a dash of lime. I was reading a recent blog about water chemistry being too alkaline and here at Round Mountain the opposite is true. The water needs to have a pH around 10.5 for the cyanide to work it's magic on the gold in the rocks so lime is added to each truck load of ore being set out onto the leach pads.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment